E-mail:sell@chinadjks.com
  • English
  • русский
  • facebook
  • youtube
  • twitter
  • google
  • linkedin
Henan Dajia Mining Machinery Co., Ltd.
  • Home
  • About Us
    • DJ Factory
    • Dj Culture & life
    • Production Market
    • Support
    • Dj History
    • Certificates
    • FAQ
    • Our Videos
  • Products
    • Crushing Equipment
    • Grinding Equipment
    • Drying Equipment
    • Calcination Equipment
    • Calcination Plant
    • Mixing Equipment
    • Diesel Engine Equipment
    • Pellet Equipment
    • Conveying Equipment
    • Mining Equipment
    • Stone Crushing Plant
    • Charcoal Equipment
    • Casting & Forges
  • News
    • Company News
    • Technical News
  • Projects
    • Calcination & Drying Plant
    • Grinding Plant
    • Other Plants
  • Contact Us
  • Inquiry
  • Home
  • About Us
    • DJ Factory
    • Dj Culture & life
    • Production Market
    • Support
    • Dj History
    • Certificates
    • FAQ
    • Our Videos
  • Products
    • Crushing Equipment
    • Grinding Equipment
    • Drying Equipment
    • Calcination Equipment
    • Calcination Plant
    • Mixing Equipment
    • Diesel Engine Equipment
    • Pellet Equipment
    • Conveying Equipment
    • Mining Equipment
    • Stone Crushing Plant
    • Charcoal Equipment
    • Casting & Forges
  • News
    • Company News
    • Technical News
  • Projects
    • Calcination & Drying Plant
    • Grinding Plant
    • Other Plants
  • Contact Us
  • Inquiry
Henan Dajia Mining Machinery Co., Ltd.
  • English
  • русский
Home> News >Technical News > The Mining Processing-Dajia Engineering
News
  • Company News
  • Technical News
Successful Projects
  • New Oil Proppant Plant In India

    New Oil Proppant Plant In India

  • Frac Sand Plant

    Frac Sand Plant

  • Clay LECA Plant in Wugang

    Clay LECA Plant in Wugang

  • Zinc Oxide kiln in Ruyang

    Zinc Oxide kiln in Ruyang

The Mining Processing-Dajia Engineering
Author: dajiaTime: 2016/12/25

1. Mining – open pit and underground

To define the ore from the waste rock, samples are taken and assayed. Assay results are used to mark out areas of ore and waste rock, which are mined separately. Some of the harder areas require blasting to loosen the rock prior to excavation by hydraulic diggers. skype:gary102884, whatsapp:+8615617816797. Dump trucks haul the rock to the primary crushers in the open pit or to the ore stockpiles from underground.

 

2. Crushing

The primary crushers located at the open pit mine site, receive ore and waste at separate times. They break the larger rocks down to a size suitable for transport on the conveyor belt.

 

3. Transport

A rubber belted conveyor transports the ore and waste rock from the open pit, approximately two kilometres, via a tunnel through Union Hill, to the mill and waste rock embankments. Large electromagnets remove any steel debris excavated from the old Martha Mine workings.

 

4. Grinding and sizing

Ore from both open pit and underground is stockpiled separately at the mill before being fed into a S.A.G. mill with lime, water and steel balls. The larger particles from this mill are returned to the S.A.G. mill for more grinding. The finer particles receive more grinding in a ball mill, and are size classified to give a final product of 80% < microns.

 

5. Leaching and adsorption

A slurry of ground ore, water and a weak cyanide solution is fed into large steel leach tanks where the gold and silver are dissolved. Following this leaching process the slurry passes through six adsorption tanks containing carbon granules which adsorb the gold and silver. This process removes 93% of the gold and 70% of the silver.

 

6. Elution and electrowinning

The loaded carbon is fed into an elution column where the bullion is washed off. The barren carbon is recycled. The wash solution—pregnant electrolyte—is passed through electrowinning cells where gold and silver is won onto stainless steel cathodes.

 

7. Bullion production

The loaded cathodes are rinsed to yield a gold and silver bearing sludge which is dried, mixed with fluxes and put into the furnace. After several hours the molten material is poured into a cascade of moulds producing bars of doré bullion. See more detail on bullion production

 

8. Water treatment

Some water from dewatering the mine, from the embankment underdrains and decant water from the tailings pond is recycled for use in the grinding circuit. Excess water is pumped to the water treatment plant and treated to the required standards before discharge into the River.

 

9. Tailings disposal

Waste rock from the open pit mine is used to build the embankment structures. The embankments retain the tailings slurry in a pond where solids settle and compact. Water is decanted off and used in the process plant or treated before it is discharged.

Previous:Dajia is only manufacture of rotary kiln pellet plant
Next:Copper Mining
Navigations
  • Home
  • PRIVACY POLICY
  • About Us
  • Products
  • News
  • Projects
  • Contact Us
  • Inquiry
Product List
  • Crushing Equipment
  • Grinding Equipment
  • Drying Equipment
  • Calcination Equipment
  • Calcination Plant
  • Mixing Equipment
Leave a Message
Contact us
  • Tel:+86-17367842747 (whatsapp)
  • Fax:+86-371-67575157
  • E-mail:sell@chinadjks.com
  • Add:West 500m Of Rizhao Road And Gongye Road, Mazhai Industrial Park, Zhengzhou, Henan, China (Mainland)
  • facebook
  • youtube
  • twitter
  • google
  • linkedin
Copyright Notice © 2015 Henan Dajia Mining Machinery Co., Ltd. PRIVACY POLICY All rights reserved. Powered by MetInfo
  • Tel
  • Mail
  • Top
  • Address
  • Inquiry